Shipton Bellinger Sewage Treatment Works

Galliford Try – Southern Water

£835k

A fast track project completed within 21 weeks.

The scope included the construction of a new oxidation ditch with 5-metre-high walls and 2 final settlement tank bases 12 metres in
diameter.

The project also included 3 deep excavations (with temporary works) for the installation of RC pumping stations.
A number of site wide pipelines and duct runs were also installed as well as the associated landscaping and footpaths.