The Hercules difference

With a reputation for excellence and recognised for our incredibly high standards throughout the water industry, our Civils Projects division have been able to efficiently expand into all sectors of the Civil Engineering industry, delivering the same high standards across a wide range of projects.

Working closely with our Labour Supply division and our Plant & Fleet division, we can react decisively and effectively at any stage of a project, whether that’s having an input at the design phase or utilising additional workforce as a project’s requirements change.

We believe in engaging early with our clients, working collaboratively to ensure all aspects of a project are reviewed and considered and that we develop solutions that are safe, robust and deliver value for money at every stage of our projects.

Case Studies

These are some examples of our projects

Peterborough Gas Compressors

Costain (Power & Energy)

£10m

A circa £10 Million civils package working for Costain & National Grid as part of the Peterborough Gas Compressor Upgrade. The works covered a varied scope including site setup, intensive investigation works, RC works, bulk excavations & demolition. These works were completed in line with a strict programme that required shutdown of the plant. Throughout […]

Redditch Sewage Treatment Works

Costain

£1.8m

Hercules worked with Costain on the redevelopment of a redundant process area at Redditch STW, enabling the installation and testing of trial process equipment for Severn Trent. The work carried out consisted of the following primary activities:

Bulls Green Pipeline

NMCN

£170k

The Bulls Green Pipeline project was for the installation of a 700mm diameter ductile iron pumping main, to run along the centre of a carriageway. In addition to supplying all site accommodation and welfare units, our scope of works included attendances on under pressure tapings, the pressure testing of the installed pipe and full re-instatement […]

Mogden Sewage Treatment Works

CABV Eight2O

£295k

Hercules delivered Eight2O’s groundworks and RC package for the Lower Thames Aeration Mitigation Project at Thames Water’s Mogden STW.

Shipton Bellinger Sewage Treatment Works

Galliford Try – Southern Water

£835k

A fast track project completed within 21 weeks. The scope included the construction of a new oxidation ditch with 5-metre-high walls and 2 final settlement tank bases 12 metres in diameter. The project also included 3 deep excavations (with temporary works) for the installation of RC pumping stations. A number of site wide pipelines and […]

Medmenham Boreholes

Costain 820

£394,304

A challenging clean water project to install new cartridge filters on an existing 800mm diameter borehole main.

Client Testimonial

"We are extremely impressed with the work carried out on site so far... The management and supervision team are well experienced, competent and pro-active in their approach to conducting work activities and have presented some of the best RAMS I have seen in a while... The operatives are all extremely competent and their ‘training packs’ are complete (including fitness to work/safety critical certification which has been something I have had many problems receiving from other contractors)... their approach to H&S is obviously set in to the culture within the company and managing them is proving to be pleasurable."

- @One Alliance